Infrastructure

STATUS OF INFRASTRUCTURE IN JNV’S
 
 
                 As per the plans, zero, first, second, third phases have been completed. The proposal regarding completion of the existing boundary wall and extending the height with barbed wire over the existing wall will be taken up during the year in consultation with the district administration and the Regional office. 
                 The M&R committee shall meet once a month or on need base to assess the need and extent of the maintenance and Repair works to be taken up on campus.
 
 
 
I
Area of land  allotted (in acres)
 
Whether land transferred in the Name of Samiti
 
Vidyalaya shifted to permanent buildings on
 
 
: 43.94 Acrs.
 
: Yes
 
 
: Yes
ii
Status of Boundary Wall
 
a.  Brick Wall
b.  Barbed wire fencing
 
 
:  Incomplete
iii
Permanent buildings constructed
 
 
: (CBRI pattern/ CPWD pattern)
 
Both
iv
School building
 
 
 
: Complete
v
Dormitories
:  Boys ___416___ Nos. ( 320  + 96)
   with Warden Residence__NIL____ Nos.
 
 
 
:  Girls __288____________ Nos. ( 240 + 48)
   with Warden Residence__NIL__ Nos.
 
vi
Kitchen/dining Hall
 
No. of shifts required for all students  to take food
 
 
:  Complete
 
One
vii
Principal Residence
 
 
:  No. 08571 - 231965
viii
Staff Quarters
 
 
 
 
: Type III = __28_ Nos.
  Type II = __2___ Nos.
  Type  I  =   12 Nos.
  SP Sheds converted into Staff Qrs.:__10 Nos.
ix
M.P. Hall
 
: Available
x
Workshop
 
: Available
xi
Type of O.H. Tank
 
Its capacity
 
Present Status
 
: Column based
 
:  _1.35.000 litres
 
: Working satisfactory
xii
U.G. tank
 
Its capacity
 
Present Status
 
 
_35,000_ litres
 
: Working satisfactory
xiii
D.G. Set
 
 
 
 
:   not available
: __KIRLOSKOR__ make
:   __10____ KV
: Working
: Year of procurement – 1991 - 92
 
xiv
Sewage Pump
 
:  5 H.P.
xv
Water Pump
 
 
:  5 capacity
xvi
Electrification
 
Electric connection
Sub Station building
Street lighting
 
Numbers of hrs. during day when power supply is available on an average.
 
 
 
 :   Urban Feeder
:    Complete
: ____75_____ Nos. of Poles
 
: ___20_____ hrs.
  
xvii
Playfields
 
400 metre track
40 x 30 metre basket ball court
40 x 30 metre volley ball court
 
 
 
:  not available
:   not available
:  not available
 
xviii
Water supply
Tube Well
Hand pump
Connection from PHED
 
 
 
: Potable,  _01___ Nos.-  working
: Potable, __04____ Nos.- not working
:   24 hours supply in a day
xix
Rajiv Gandhi Smriti Van
 
:   not available
xx
Fire fighting arrangement
 
:  Working
xxi
Last date of cleaning of
(a)   Septic tank
(b)   Water tanks
 
: October, 2007
: December,2007
xxii
Whether area around transformer is fenced
:  Yes 
xxiii
Whether open wells, if any, are covered from top
:   N.A
xxiv
Works taken up under M&R fund during current year and last year:-
 
:
Year
Name of work  (M&R)
Expenditure
(Rs. In lacs)
Cumulative expenditure during the year
2007-08
White Wash & Colour Wash , Painting Etc.,
4.50 lacs
4.50 lacs
 
2008-09
Emulsion Painting